Condo - Rating 4.9 (11)

Oceanview, 2 Pools & Beach


Bedroom 1 bedrooms
Bathroom 1 baths
Guests 2 guests
Pets Not Allowed Pets Not Allowed

  • Address: South Atlantic Avenue
  • Location: Daytona Beach
  • Type: Condo

Location Location

Description Description
Welcome to your cozy ocean-view retreat in Daytona Beach!

The space has a bright coastal feel, a comfortable bed, a sitting area, a television, and a compact kitchen setup that makes it easy to enjoy breakfast, snacks, or simple meals during your stay.

The studio includes:

Comfortable bed for two guests

Ocean views

Smart TV

Sitting area

Kitchenette with refrigerator and microwave

Coffee maker

Counter seating

Private bathroom

Ceiling fan

Air conditioning

Guests can enjoy access to two community pools:

An outdoor oceanfront pool with lounge seating

An indoor pool, perfect for rainy days, cooler weather, or a break from the Florida sun

The building also features a community game room with:

Pool table

Foosball

Arcade games

Additional games and entertainment

Please note that some games are complimentary and others require payment.

Beach access

Kitchenette

The kitchenette is convenient for light meals and includes:

Full-size refrigerator

Microwave

Coffee maker

Sink

This is a studio kitchenette rather than a full chef’s kitchen. Guests planning to cook elaborate meals should consider the compact size and available appliances.

The studio accommodates a maximum of two guests.

The indoor and outdoor pools are shared community amenities.

Pool availability, hours, temperature, and maintenance schedules are controlled by the building or association and cannot be guaranteed.

Some game room activities are free, while others require coins, cards, or electronic payment.

Ocean views may be partial or angled depending on the exact viewpoint from the unit.

This is a privately owned studio within a shared condominium or resort-style building.

Guests may experience normal sounds associated with a beachfront building and shared community spaces.

Hurricanes, storms, building maintenance, and local beach conditions may occasionally affect access to amenities.

Commercial photography and décor may make spaces appear larger. Review the photos carefully to understand the studio layout.


Availability Calendar Availability Calendar
Available
Unavailable
Check-In
Check-Out
November 2026
Su Mo Tu We Th Fr Sa
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          
December 2026
Su Mo Tu We Th Fr Sa
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31    
January 2027
Su Mo Tu We Th Fr Sa
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31            
February 2027
Su Mo Tu We Th Fr Sa
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28            
March 2027
Su Mo Tu We Th Fr Sa
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      
April 2027
Su Mo Tu We Th Fr Sa
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  
May 2027
Su Mo Tu We Th Fr Sa
            1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31          
June 2027
Su Mo Tu We Th Fr Sa
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30      
July 2027
Su Mo Tu We Th Fr Sa
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
August 2027
Su Mo Tu We Th Fr Sa
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        
September 2027
Su Mo Tu We Th Fr Sa
      1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30    
October 2027
Su Mo Tu We Th Fr Sa
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31            
Swipe Swipe for Availability

Bedding Bedding
Room 0
1 Queen Bed


Amenities 59 Amenities
  • Balcony
  • Basketball court
  • Beach
  • Beach front
  • Beach view
  • Body soap
  • Car necessary
  • Car recommended
  • Carbon Monoxide Detector
  • Coffee
  • Coffee/tea maker
  • Communal swimming pool
  • Communal tennis court
  • Conditioner
  • Contactless Check-In/Out
  • Deadbolt lock
  • Enhanced Cleaning Practices
  • Family
  • Free parking
  • Free WiFi
  • Game room
  • Golf
  • Golf optional
  • Health beauty spa
  • Heated swimming pool
  • Heating
  • Hot water
  • Indoor pool
  • Internet
  • Kitchen
  • Kitchen utensils
  • Linens
  • Long term stays allowed
  • Microwave
  • Near ocean
  • Ocean front
  • Ocean view
  • Outdoor furniture
  • Outdoor play area
  • Outdoor sunloungers
  • Oven
  • Pool
  • Private entrance
  • Private living room
  • Refrigerator
  • Room darkening shades
  • Shampoo
  • Shower
  • Shower gel
  • Smart TV
  • Suitable for children
  • Suitable for infants
  • Toilet
  • Towels
  • TV
  • Water view
  • Waterfront
  • Wine glasses
  • Swimming pool

Reviews Rating 4.9 (11) Reviews
Rating 5
Great view nice place
Gaberial - Posted: 9/6/2026
Thanks for the review, Gaberial. Glad you enjoyed. You're always welcome back!
My Salty Dog Vacation staff
Rating 5
We needed a quick, clean, easy to get to place to stay when visiting our son at Embry Riddle- This place was so cute and such a diamond in the rough (not what you’d expect to find on the inside) - Great communication - would definitely stay here again!!
Kendra - Posted: 8/30/2026
Kendra! so glad place was clean, convenient spot you needed for your visit to Embry-Riddle. Thanks for the kind words about the place and our communication, we’d love to host you again next time you’re in town!
My Salty Dog Vacation staff
Rating 5
Great stay! Clean place, awesome location, very helpful and friendly host, and the place was exactly as pictured and described. Would 100% stay again!
Brayden - Posted: 8/8/2026
Rating 5
Great stay! Clean place, awesome location, very helpful and friendly host, and the place was exactly as pictured and described. Would 100% stay again!
Brayden M - Posted: 8/8/2026
Rating 5
great place, felt clean and the location was wonderful. the host was responsive and was very nice knowing we only booked one night, would book again !!
Angilee - Posted: 7/30/2026
Rating 5
great place, felt clean and the location was wonderful. the host was responsive and was very nice knowing we only booked one night, would book again !!
Angilee Z - Posted: 7/30/2026
Rating 5
Absolutely epic! No complaints. Wonderful communication and ambience.
Ramon - Posted: 7/30/2026
Rating 5
Absolutely epic! No complaints. Wonderful communication and ambience.
Ramon R - Posted: 7/30/2026
Rating 5
Our stay at this oceanfront Airbnb was absolutely magnificent. The unit was spotless, beautifully maintained, and offered breathtaking views of the ocean. Waking up to the sound of the waves and enjoying sunsets from the balcony made for an unforgettable experience. The host was responsive and welcoming, making everything seamless from check-in to check-out. We couldn’t have asked for a better place to stay and would gladly return. Highly recommended!
Leonard - Posted: 7/29/2026
Rating 5
Our stay at this oceanfront Airbnb was absolutely magnificent. The unit was spotless, beautifully maintained, and offered breathtaking views of the ocean. Waking up to the sound of the waves and enjoying sunsets from the balcony made for an unforgettable experience. The host was responsive and welcoming, making everything seamless from check-in to check-out. We couldn’t have asked for a better place to stay and would gladly return. Highly recommended!
Lj J - Posted: 7/29/2026
Rating 4
The space was very clean and updated. . We had trouble finding the room. I wish we would have had instructions for that. Also, the parking lot is really dark at night. I was super glad I had a friend with me because I would have felt very unformtable otherwise. The space is an an older motel. It does however look out over the ocean. There is a pool and beach access.
Krista W - Posted: 7/28/2026
Swipe Swipe for More Reviews

Have a question? Customer Questions & Answers Have a question? Customer Questions & Answers

Want to know specifics? Ask anything about this specific property that you would like to know...

Example: "Is the balcony screened in?" or "Is there a toaster oven?"


Request More Info Request More Info

Want to know specifics? Ask anything in reference to vacationing at this property that you would like to know...

Example: "Are fresh linens provided?"

I agree

Good to know Good to know
  • Check-in: 4:00 PM
  • Check-out: 10:00 AM
  • Pets: Not allowed
  • Smoking inside: Not allowed

Cancellation policy

100% refund up to 60 days before arrival

50% refund up to 30 days before arrival